EU • Project Preparation • FIDIC
Project Preparation Facility for Municipal Infrastructure to Support the Earthquake Recovery
Multi-city project preparation covering feasibility, design review, conceptual and final design, environmental-social and climate inputs, and FIDIC tender documentation.
ClientEU Delegation to Türkiye
Period2024–2027
ServicesF • PD • FD • T
AssociationAQWADEM
Project highlightsFeasibility for municipal water and wastewater investments; FIDIC Red & Yellow Book tender documents; final design for Malatya water, wastewater and stormwater networks.
View project profile →
EU • Technical Assistance • 15 Contracts
Technical Assistance to the EU Delegation to Türkiye
Long-term technical assistance delivered under 15 separate contracts for environmental infrastructure procurement, monitoring and appraisal.
ClientEU Delegation to Türkiye
Period2010–2024
Contracts15 separate assignments
FrameworkEU Framework Contracts
Core servicesTechnical review of master plans, feasibility studies, designs and procurement files; tender-observer participation; monitoring; appraisal; prioritisation support.
View project profile →
Wastewater • MBBR / IFAS
Menemen & Foça Bağarası WWTP Capacity Upgrades
Feasibility and multidisciplinary implementation design for capacity upgrades of two existing wastewater treatment plants.
ClientİZSU
Period2023–2024
Menemen21,600 → 60,000 m³/day
Bağarası2,100 → 3,300 m³/day
ScopeMBBR and IFAS process upgrades without changes to existing structures; process, architectural, structural, mechanical and electrical design; tender documents and BoQ.
View project profile →
Sludge • Rehabilitation
Çiğli WWTP Sludge Storage Area Rehabilitation
Detailed rehabilitation and closure design for a major sludge storage area at Çiğli WWTP.
ClientİZSU
Period2024
Site131 ha
Stored sludge≈ 2.5 million m³
ScopeDeep lime mixing rehabilitation, closure implementation design, tender documents, data sheets and bills of quantities.
View project profile →
Wastewater • Detailed Design • EIA
Torbalı Wastewater Treatment Plant — 2nd Stage
Implementation design and environmental impact assessment for a large municipal wastewater treatment plant.
ClientİZSU
Period2016–2018
Capacity56,000 m³/day
ProcessNitrification-denitrification
ScopeMultidisciplinary detailed design, tender documents and Environmental Impact Assessment Study.
View project profile →
Wastewater • Detailed Design
İvrindi, Manyas & Erdek WWTP Detailed Designs
Feasibility and detailed implementation design of three wastewater treatment plants in Balıkesir Province.
ClientBASKİ
Period2023–2024
İvrindi / Manyas2,500 m³/day each
Erdek4,500 m³/day
ScopeFeasibility, implementation design, detailed projects, tender documents, data sheets and bills of quantities.
Odour Control • Detailed Design
Odour Treatment for 4 Pumping Stations in İzmir
Detailed design of odour treatment systems for Karşıyaka, Bayraklı, Çiğli and Gümrük wastewater pumping stations.
ClientİZSU
Period2017–2018
Facilities4 pumping stations
DisciplineMultidisciplinary FD
ScopeProcess, architectural, civil, mechanical, electrical and automation design for odour treatment systems, plus tender documents.
UNDP • Cyprus • Detailed Design
Industrial & Septage Wastewater Treatment Facility
Multidisciplinary detailed design for an industrial and septage wastewater treatment facility.
Client / ProgrammeUNDP
CountryCyprus
Period2021–2022
ServicesMultidisciplinary FD
ScopeProcess, architectural, civil, mechanical, electrical and automation design, EIA, BoQ and implementation advisory services.
View project profile →
Water • Detailed Design
Bostanlı Dam Water Treatment Plant & Transmission Line
Multidisciplinary detailed design of a water treatment plant and associated transmission infrastructure.
ClientİZSU
Period2016–2018
WTP Capacity150 L/s
Transmission7 km
ScopeProcess, architectural, civil, mechanical, electrical and automation design; transmission line design; tender documents.
View project profile →
Water • 4 Plants • Detailed Design
4 Water Treatment Plants for Mordoğan, Karaçam, Çandarlı & Bozköy Dams
Detailed design of four water treatment plants serving different dam-water supplies in İzmir Province.
ClientİZSU
Period2015–2016
Capacities12 / 16 / 45 / 63 L/s
Plants4 WTPs
ScopeProcess, architectural, civil, mechanical, electrical and automation detailed design and preparation of tender documents.
Wastewater • Detailed Design
Mordoğan Wastewater Treatment Plant
Detailed design of a municipal wastewater treatment plant based on activated sludge with nitrification-denitrification.
ClientİZSU
Period2015–2016
Average Flow11,000 m³/day
Maximum Flow16,500 m³/day
ScopeProcess, architectural, civil, mechanical, electrical and automation detailed design; tender documents.
Water • Detailed Design
Halkapınar Water Treatment Plant
Multidisciplinary detailed design of a high-capacity water treatment plant for raw water with high arsenic content.
ClientİZSU
Period2014
Capacity500 L/s
Raw WaterHigh arsenic content
ScopeProcess, architectural, civil, mechanical, electrical and automation detailed design and tender documents.
Water • Detailed Design
Menemen Water Treatment Plant
Detailed design of a water treatment plant for raw water with high arsenic content.
ClientİZSU
Period2015
Capacity250 L/s
ServicesFD • Tender Docs
ScopeProcess, architectural, civil, mechanical, electrical and automation detailed design and tender documentation.
World Bank • Azerbaijan • Detailed Design
Masallı Water & Wastewater Treatment Plants
Process and detailed engineering for municipal water and wastewater treatment facilities.
CountryAzerbaijan
FinancingWorld Bank
WWTP7,500 m³/day • 31,200 PE
WTP22,200 m³/day
ScopeDetailed design of municipal wastewater and water treatment plants.
View project profile →
Turkmenistan • Detailed Design
Kaka Water Treatment Plant
Detailed design of a compact water treatment plant with conventional treatment and UV disinfection.
CountryTurkmenistan
Period2012
Capacity3,000 m³/day
ServicesFinal Design
ProcessCoagulation, flocculation, sedimentation, pressurised sand filtration, UV disinfection and storage tanks.